Taking Form
I took an early morning ride up to the site to see if the walls had been poured on the footings yet. Much to my satisfaction, the foundation forms had been put up and the walls had been poured. Sadly, I couldn't get into it, as the concrete was still wet.
'
Took a late ride with my father-in-law to get the DWV pipe, fittings and supplies for putting down the radiant floor and drop them off at the site. We didn't get there until 9pm and didn't get home until 10:30pm or so, so thank you for your help and patience Tom! Both the DWV and the radiant have to be put in before the floor slab can be poured. Since we had problems getting hold of plumbers, we will have to do both to keep things moving along.
'
Took a late ride with my father-in-law to get the DWV pipe, fittings and supplies for putting down the radiant floor and drop them off at the site. We didn't get there until 9pm and didn't get home until 10:30pm or so, so thank you for your help and patience Tom! Both the DWV and the radiant have to be put in before the floor slab can be poured. Since we had problems getting hold of plumbers, we will have to do both to keep things moving along.
0 Comments:
Post a Comment
<< Home